| Note: 
      The
AES / MSC building at 4905 Dufferin St. had various environmental or
"green"
infrastructures installed, either at inception or later.   These included solar heated hot water and air conditioning from sub-surface cooling. In 1989, the new ADM, Elizabeth Dowdeswell, was already a keen "green" supporter and wanted to see these facilities first hand. The photos below show her visit to the sub-basement of the building. | 
|  ?, Elizabeth Dowdeswell, Bloise Thomson (DPW) |  ?, Elizabeth Dowdeswell, Bloise Thomson (DPW) | 
|  Bloise Thomson (DPW), Elizabeth Dowdeswell, ? (face) |  ?, Elizabeth Dowdeswell, Bloise Thomson (DPW) (back) |